Live Help
 
About Us
Company Introduction
Certificate
Project Cases
Contact Us
 
Search
Keyword:
Scope:
HomeAbout Us Project Cases
     
 
Project Cases















Project Name:Luzhou period of Uppersteam of Yellow River
Supply Product:Triple Row,Double Layer,Reinforced
Project Type:Crossriver Bridge
Single lane,single span
Length:54m


Project Name:Water conservancy project in Lhasa
Bridge Type:HD200,Double Row, Single Layer
Double lane,five spans
Length:152.4m
Loading capacity:60T


Project Name:Dragon Star Chemical Factory Pipe Bridge
Supply Product:Pipe Bridge
Advantages:easily installed, reasonable price, quickly assembled, Using Unskilled labor, Factory provide directly


Project Name:Bailey steel bridge in Gansu Province
Bridge Type:CB100 Bridge, Triple Row, Single Layer, Reinforced
Single lane,two spans
Length:54m, 27m/span


Project Name:Pankou Hydropower Station in Hubei Province
Bridge Type:HD200, Double Row, Single Layer, Reinforced
Length:82.296m


Project Name:Dongsong Hydropower Station in Sichuan Province
Bridge Type:HD200, Double Row, Single Layer, Reinforced
Length:48m


Project Name:Bailey bridge in Anhui Province
Bridge Type:HD200, Double Row, Single Layer
Address:Guoyang, Anhui province, the hometown of Lao Tzu
Characteristic:steel structure bridge, beautiful appearance, erected easily, reasonable price


Project Name:Bailey bridge for Xiamen-Shenzhen railway
Bridge Type:CB100, Multi-span bailey bridge
Length:260m


Total pages:1  NO  1  Page 

 
 
Jiangsu Bailey Bridge Co.,LTD © 2007-2010 All rights reserved 苏ICP备10083244号
Tel:0086-13775377436 Fax:0086-511-88881212 Address:No.2 South Jingwu Road,Dingmao Industry Park,Zhenjiang City,Jiangsu Province,China E-mail:jsbeileivip@163.com
安全上网 网上报警