| |
Project Cases







Project Name:Luzhou period of Uppersteam of Yellow River Supply Product:Triple Row,Double Layer,Reinforced Project Type:Crossriver Bridge Single lane,single span Length:54m
 Project Name:Water conservancy project in Lhasa Bridge Type:HD200,Double Row, Single Layer Double lane,five spans Length:152.4m Loading capacity:60T
 Project Name:Dragon Star Chemical Factory Pipe Bridge Supply Product:Pipe Bridge Advantages:easily installed, reasonable price, quickly assembled, Using Unskilled labor, Factory provide directly
 Project Name:Bailey steel bridge in Gansu Province Bridge Type:CB100 Bridge, Triple Row, Single Layer, Reinforced Single lane,two spans Length:54m, 27m/span
 Project Name:Pankou Hydropower Station in Hubei Province Bridge Type:HD200, Double Row, Single Layer, Reinforced Length:82.296m
 Project Name:Dongsong Hydropower Station in Sichuan Province Bridge Type:HD200, Double Row, Single Layer, Reinforced Length:48m
 Project Name:Bailey bridge in Anhui Province Bridge Type:HD200, Double Row, Single Layer Address:Guoyang, Anhui province, the hometown of Lao Tzu Characteristic:steel structure bridge, beautiful appearance, erected easily, reasonable price
 Project Name:Bailey bridge for Xiamen-Shenzhen railway Bridge Type:CB100, Multi-span bailey bridge Length:260m
Total pages: 1 NO 1 Page 
|
|